Skip to content

West London

Commercial Ductwork Contractors Heathrow

Ventilation, kitchen extract and industrial ductwork for hotels, catering, logistics and commercial premises around Heathrow.

The Heathrow area supports a concentration of hotels, flight catering and food production facilities, freight and logistics premises, and airport-related offices — all operating continuously.

Ductwork work here is defined by two things: the buildings rarely stop, and access is controlled. Both are planned into the programme rather than treated as obstacles.

Hotels and catering facilities

Hotel kitchen extract, back-of-house extract and plant room ventilation works are phased around 24-hour operation, with agreed isolations and works frequently carried out overnight.

Food production and flight catering

Production environments require hygienic installation practice, stainless construction where specified, cleanable extract systems and works planned around production shifts and audit requirements.

Access, permits and security

Airport and airport-adjacent sites impose pass, permit, escort and vetting requirements. These are established before mobilisation so that labour is cleared and productive from day one.

Logistics and freight premises

Warehouse and freight buildings require high-level distribution, make-up air and general extract installed from MEWPs around live operations.

Send us your drawings

Issue your drawings, specification or scope of works and our commercial team will review the requirements and return a quotation.